The Environment Agency Perry Barr and Witton flood risk management scheme is in full swing. As the MEICA consultant on the project we design the Mechanical / Electrical elements of the scheme. The four large penstock will automatically control flow of the river Tame in flood conditions, impounding water in a new specially design resevoir to protect 1450 properties in further down the river Tame at Brookvale Road Witton. The problem we had to over come in the design was the distance of the 2 satellite from the Main control structure, a distance of 7KM. We design a Motor Control cabinent with dual redundancy PLC's, Dual power supplies from seperate 33KV rings, Dual path communications using the latest 4G and ADSL capabilities to create a securing VPN network between all the site. Working is on going on all the sites with a estimate completion date of late 2021.